Our Product at a Glance (MESCO STEEL I)
PIG IRON
ig iron is an intermediary product when iron ore is smelted with a fuel with high carbon, such as coke.
P This is usually done with limestone to act as the flux. Anthracite as well as charcoal can be utilized as
fuel as well.
It has a fairly high carbon content combined with silica and dross constituents, making it very brittle. Pig iron
should not be directly utilized as a material with the exception of some limited applications.
Pig iron is produced in the blast furnace sector. The raw materials used include ore, sinter, coke, lime and
various aggregates.
To ensure that the production process maintains a high and stable level of quality, these materials have to be
metered precisely and supplied to the blast furnace in batches.
SPECIFICATIONS WEIGHT DIMENSION (mm)
PIG IRON PIG IRON
C Si Mn S P (KG) L B H
STEEL 3.8 to 4.2 1.49 (max) 0.20 (max) 0.060 (max) 0.120 (max)
SIZE-1
MISL-1 3.8 to 4.2 1.50 to 1.99 0.30 to 0.50 0.060 (max) 0.120 (max) 13.47 240 150 100
MISL-2 3.8 to 4.2 2.00 to 2.49 0.30 to 0.50 0.060 (max) 0.120 (max) (PCM-l)
MISL-3 3.8 to 4.2 2.50 (min) 0.30 to 0.50 0.060 (max) 0.120 (max) SIZE-2 14.8 245 225 70
BASIC 3.8 to 4.2 >2.50 0.30 to 0.50 >0.060 0.120 (max) (PCM-2)
SINTER
The Concept Of Waste To Wealth
t MISL, Sinter Plant having two number of widely adopted by all the Iron makers in the world.
A sinter machines each 36 M2, with different In case of our Plant, we have so far achieved our
bed height, 450 mm and 500 mm. The hot metal production and coke rate beyond the
designed capacity 993 TPD, achieved 1124 TPD target in Blast Furnace. It is one of the great
and 1202 TPD from Band-I and Band- II respectively. causes that we are producing good chemical and
Sinter Plant playing a vital role in our Physical quality of Sinter, having More
plant to make Hot metal through Blast than 55% TFe with 1.9 % basicity and
furnace. Using the Sinter in Blast Tumbler Index more than 70, as
furnace reduce coke rate, raw flux required by Blast Furnace, which was
consumption and enhance difficult to produce before restarting the
productivity of the furnace... Furance in Nov'2017.
It is a process of agglomeration at high There was a critical time for MESCO in
temperature, by the incipient fusion of Iron fines, coke the period of Oct'2015- Nov '2017 due to global
breeze Lime stone, Dolomite fines and other recession in steel market and other reasons too.
metallurgical waste under desired vacuum. But we think this is the best time ever for MESCO
Keeping the operation in Mines in past ,when the when we overcome the entire barrier which was
mechanized mining was started , the fines affecting to reach our target.
generation was approx 60%, which was not suitable The Team Sinter Plant is very grateful to our
for Blast furnace to charge directly but it could not be management in extending all possible support
thrown like a waste and that fines also contains a rich and providing required technical grade of raw
percentage of Iron i.e. 58-65% also became a materials, equipment spares and other
hindrance for dumping. After lot of research and accessories. I am confident to reach new height in
development the metallurgists finally succeeded to production of sinter with desired quality and do
utilize it to extract iron from the fines and sintering thankful to my all colleagues to provide their
process came in existence by Russian and German endless effort; otherwise it was not possible to
metallurgists, just before 1st world war. Now it is meet our target.
The finest steel has to go through the hottest fire