                 Our Product at a Glance (MESCO STEEL I)

                                                       PIG IRON
                     ig iron is an intermediary product when iron ore is smelted with a fuel with high carbon, such as coke.
               P     This is usually done with limestone to act as the flux. Anthracite as well as charcoal can be utilized as
                     fuel as well.
                It has a fairly high carbon content combined with silica and dross constituents, making it very brittle. Pig iron
                should not be directly utilized as a material with the exception of some limited applications.
                Pig iron is produced in the blast furnace sector. The raw materials used include ore, sinter, coke, lime and
               various aggregates.
               To ensure that the production process maintains a high and stable level of quality, these materials have to be
                metered precisely and supplied to the blast furnace in batches.
                                          SPECIFICATIONS                        WEIGHT     DIMENSION (mm)
                 PIG IRON                                              PIG IRON
                            C        Si      Mn        S        P                 (KG)   L     B      H
                  STEEL   3.8 to 4.2  1.49 (max)  0.20 (max)  0.060 (max)  0.120 (max)
                                                                         SIZE-1
                  MISL-1  3.8 to 4.2  1.50 to 1.99  0.30 to 0.50  0.060 (max)  0.120 (max)  13.47  240  150  100
                  MISL-2  3.8 to 4.2  2.00 to 2.49  0.30 to 0.50  0.060 (max)  0.120 (max)  (PCM-l)
                  MISL-3  3.8 to 4.2  2.50 (min)  0.30 to 0.50  0.060 (max)  0.120 (max)  SIZE-2  14.8  245  225  70
                  BASIC   3.8 to 4.2  >2.50  0.30 to 0.50  >0.060  0.120 (max)  (PCM-2)
                                                         SINTER
                                               The Concept Of Waste To Wealth
                      t MISL, Sinter Plant having two number of  widely adopted by all the Iron makers in the world.
               A      sinter machines each 36 M2, with different  In case of our Plant, we have so far achieved our
                      bed height, 450 mm and 500 mm. The  hot metal production and coke rate beyond the
                      designed capacity 993 TPD, achieved 1124 TPD target in Blast Furnace. It is one of the great
               and 1202 TPD from Band-I and Band- II respectively.  causes that we are producing good chemical and
               Sinter Plant playing a vital role in our                Physical quality of Sinter, having More
               plant to make Hot metal through Blast                  than 55% TFe with 1.9 % basicity and
               furnace. Using the Sinter in Blast                     Tumbler Index more than 70, as
               furnace reduce coke rate, raw flux                      required by Blast Furnace, which was
               consumption and enhance                                 difficult to produce before restarting the
               productivity of the furnace...                          Furance in Nov'2017.
                It is a process of agglomeration at high               There was a critical time for MESCO in
               temperature, by the incipient fusion of Iron fines, coke  the period of Oct'2015- Nov '2017 due to global
               breeze Lime stone, Dolomite fines and other  recession in steel market and other reasons too.
               metallurgical waste under desired vacuum.      But we think this is the best time ever for MESCO
                Keeping the operation in Mines in past ,when the  when we overcome the entire barrier which was
               mechanized mining was started , the fines  affecting to reach our target.
               generation was approx 60%, which was not suitable  The Team Sinter Plant is very grateful to our
               for Blast furnace to charge directly but it could not be   management in extending all possible support
               thrown like a waste and that fines also contains a rich   and providing required technical grade of raw
               percentage of Iron i.e. 58-65% also became a   materials, equipment spares and other
               hindrance for dumping. After lot of research and   accessories. I am confident to reach new height in
               development the metallurgists finally succeeded to  production of sinter with desired quality and do
               utilize it to extract iron from the fines and sintering  thankful to my all colleagues to provide their
               process came in existence by Russian and German   endless effort; otherwise it was not possible to
               metallurgists, just before 1st world war. Now it is  meet our target.

                                The finest steel has to go through the hottest fire
   9   10   11   12   13   14   15   16   17   18   19